
|
|
|
HUSKOGEN
The Power Generation FBC Boiler
|
-
Package Power Boiler with minimum erection
time and cost.
-
Built-in Superheater
-
Packaged Concept, Minimum welding at Installation site. No Expansion of tubes.
-
Steady Steam Pressure and Temperature for critical turbine applications.
-
Loaded with high efficiency drum internals
|
 |
Home
||
About IBL
||
IBL Network
||
Products
||
Contact Us
|